🚄 The BS EN 62625 series is the British Standard adoption of the IEC 62625 series, specifying the system specification and conformity testing requirements for on board driving data recording systems (commonly called the train “black box”) in railway electronic equipment. The system continuously records speed, signal, braking, traction, driver actions, and fault information during train operation — a critical data source for accident investigation, operation analysis, driver assessment, and rolling stock maintenance, and essential to railway operation safety.
💡 The series is maintained by UK Technical Committee GEL/9 (Railway Electrotechnical Applications), exactly mirroring the international standards developed by IEC/TC 9 (Electrical equipment and systems for railways). It covers on board recording devices for locomotives, EMUs, and urban rail vehicles.
1. Series Structure and Scope 📌
The BS EN 62625 series currently comprises two parts:
| Standard No. | Title | Main Purpose | Year |
| BS EN 62625-1 | On board driving data recording system — Part 1: System specification | System functions, recorded content, construction and environmental requirements | 2013 |
| BS EN 62625-2 | On board driving data recording system — Part 2: Conformity testing | Test methods, test environments, and acceptance criteria | 2016 |
The series covers electronic recording devices on various railway vehicles, classified under ICS 45.060. Part 1 defines “what the system should be”; Part 2 defines “how to verify the system conforms” — together forming a complete design-and-verification loop.
⚠️ An on board driving data recording system differs from a general industrial data acquisition system: it operates in a harsh railway environment with vibration, temperature variation, and severe electromagnetic interference, and its data may be used to determine accident responsibility — hence strict requirements on data integrity, time synchronisation, and damage resistance.
2. Part 1: System Specification 🔧
BS EN 62625-1:2013 specifies the system specification. Main content includes:
- Recorded data items: specifies the speed, time, signal status, driver command, fault and alarm data to be recorded, with their sampling/recording intervals.
- Data storage: specifies recording medium capacity, circular-overwrite strategy, and power-off retention so critical pre/post-incident data can be read completely.
- Time and synchronisation: specifies clock accuracy, time-setting method, and time-stamping requirements for multi-source data.
- Construction and interfaces: specifies mechanical structure, electrical interfaces, train-network connection, and human-machine interface.
- Environmental conditions: specifies operating temperature, humidity, vibration, shock, and EMC environment the device must withstand.
- Safety requirements: specifies basic requirements for supply protection, anti-misoperation, and data tamper resistance (secure access).
✅ The value of Part 1 is defining “what to record, how to record, and how to preserve”: it fixes the functional architecture of the recording system, providing a uniform basis for manufacture, acceptance, and use.
3. Part 2: Conformity Testing 📊
BS EN 62625-2:2016 specifies the test methods and criteria for conformity. Key points include:
- Functional tests: verify correct acquisition, recording, and output of various input data (speed, signal, driver commands, etc.).
- Data integrity tests: simulate power loss, restart, and medium failure to verify recorded data is neither lost nor corrupted.
- Environmental tests: verify survivability in the railway environment under specified temperature, humidity, vibration, and shock conditions.
- EMC tests: verify normal operation and immunity under electromagnetic interference.
- Time accuracy tests: verify clock accuracy and the accuracy of data time stamps.
- Test records and documentation: specifies the content and format of test reports as the basis for type approval.
🚨 Conformity testing is the guarantee of trustworthiness of the recording system: if the system fails to record complete data at a critical fault moment, or records inaccurate time, accident investigation and responsibility determination are seriously compromised. Tests must cover the harshest conditions.
4. Key Technical Requirements 📏
| Requirement | Content | Engineering Focus |
| Recording overwrite strategy | Overwrite rules when the medium cycles | Ensure the most critical pre/post-incident records are fully retained |
| Power-off retention | Ability to keep data after power loss | Involves supply backup and storage-medium reliability |
| Time synchronisation accuracy | Limit on clock deviation from standard time | Multi-source data must be correctly ordered and correlated |
| Environmental survivability | Normal operation under temperature, humidity, vibration, shock | Directly affects device reliability on site |
| Data integrity | Readability and damage resistance of recorded data | Basis for accident investigation and traceability |
⚠️ The data of an on board driving data recording system is safety-critical: its storage medium, file system, and interface design should provide tamper resistance and traceability, and the recorded content and format should be readable by accident-investigation tools.
5. Engineering Practice 🛠️
- Locomotives and EMUs: install recording systems on mainline locomotives and high-speed EMUs for operation monitoring and accident investigation.
- Urban rail: driving data recording on metro and light-rail vehicles to support operation safety analysis and driver assessment.
- Driver training and assessment: replay recorded driver actions to support training and evaluation.
- Rolling stock maintenance: analyse fault records to optimise inspection plans.
- Integration workflow: define requirements per Part 1 → design and develop → conduct type tests per Part 2 → on-board verification → operation and maintenance.
6. Frequently Asked Questions ❓
❓ Q: How does the BS EN 62625 “driving data recording system” compare with an aviation “black box”?
A: Functionally similar — both continuously record operation data for later analysis. But the railway environment, recorded objects, and data structure differ, so this series sets dedicated requirements for on board railway applications.
❓ Q: How do Parts 1 and 2 work together?
A: Part 1 gives the system requirements (design input); Part 2 gives the test methods and criteria for verifying those requirements (acceptance basis). Together they form the complete contractual and acceptance foundation.
❓ Q: How long can recorded data survive a power loss?
A: It depends on the recording medium and backup supply design. The standard requires critical data to remain complete and readable after power loss; the exact retention time should be confirmed from the equipment specification and verified during maintenance.
❓ Q: Can driving data be used as evidence for accident responsibility?
A: Yes, provided the system meets this series’ data integrity and time-accuracy requirements and the data-reading process is traceable and tamper-resistant; otherwise its evidentiary value may be affected.