🚇 BS EN 62290 is the British Standard implementation of IEC 62290, maintained by BSI Technical Committee GEL/9 (Railway Electrotechnical Applications). The technical content is identical to IEC 62290. The series specifies the system principles and functional requirements for urban guided transport management and command/control systems (UTRMS/TCS). The signalling and operational-control systems of urban rail transit (metro, light rail, monorail, automated guideway transit, etc.) play a key role in ensuring traffic safety, increasing capacity and reducing energy and maintenance costs. The series provides a unified framework for the design, functional-requirement definition and acceptance of urban rail signalling systems, and connects with the engineering practice of existing systems such as CBTC (communication-based train control) and automatic train control (ATC). This article covers two parts: Part 1 specifies system principles and fundamental concepts, and Part 2 specifies the functional requirements specification.
The BS EN 62290 series is maintained by BSI Technical Committee GEL/9 (Railway Electrotechnical Applications), with UK experts participating in the work of IEC TC 9 (Electrical equipment and systems for railways). The series consists of two parts: Part 1 (2014 edition) supersedes the 2006 edition and specifies system principles and fundamental concepts; Part 2 (2014 edition) supersedes the 2011 edition and specifies the functional requirements specification. Both parts are based on IEC 62290 and are adopted by CENELEC. As stated in the standard, compliance with a British Standard does not confer immunity from legal obligations, and users remain responsible for correct application.
Within the railway signalling standard framework, IEC 62290 works together with IEC 62267 (safety requirements for automated urban guided transport systems) and related standards to support the automation and operational management of urban rail transit. The system targets the specific domain of “urban rail transit”, and differs from mainline railway systems (such as ETCS/ERTMS) in functions and safety levels.
The BS EN 62290 files covered by this article comprise two parts:
| Standard number | Year | Title | Key content |
|---|---|---|---|
| BS EN 62290-1:2014 | 2014 | Part 1: System principles and fundamental concepts | System principles, architecture, functional levels, grades of automation (GoA) and fundamental concepts of the UTRMS/TCS, forming the basis of the series |
| BS EN 62290-2:2014 | 2014 | Part 2: Functional requirements specification | Functional requirements of the UTRMS/TCS, including train operation, routes, interlocking, supervision, diagnostics, human-machine interface and operational management |
The UTRMS/TCS normally comprises the operation-management system, the signalling and train-control system, the communication system, and the monitoring and diagnostics system, organised in a layered architecture of “control centre — station/trackside — on-board”. The standard specifies the responsibilities, interfaces and information flows of each level, ensuring that the integrated system is complete, safe and reliable.
Grades of automation for urban rail are typically divided into:
The standard specifies the functions each grade must provide and the division of safety responsibility, forming the technical basis for engineering design and procurement.
The functional requirements of Part 2 include: train position and speed detection, route and interlocking control, automatic train protection (ATP), automatic train operation (ATO), automatic train supervision (ATS), train-to-trackside/centre communication, door control and platform-screen-door interlocking, fault diagnostics and degraded modes, human-machine interface (HMI), and operational dispatching and information management. For each function the standard specifies inputs, processing, outputs and performance (availability, reliability, safety), as well as interfaces and data exchange.
The implementation of an urban rail signalling system follows the sequence “requirements analysis → system design → integration testing → on-site commissioning → trial operation → acceptance”. Based on this series, the client determines the system architecture and grade of automation from Part 1, defines the functional requirements from Part 2, and accordingly prepares the tender specification and acceptance criteria. Acceptance normally includes: equipment/sub-system type tests and routine tests, integration testing, safety assessment (for example RAMS and safety-integrity assessment in accordance with EN 50126/50128/50129) and on-site verification. As a safety-related system, the signalling system must also undergo independent safety assessment (for example by a third-party assessor) to confirm that the required safety-integrity level is achieved.