Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124
Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124
🚄 The BS EN 61375 series is the British Standard implementation of EN 61375, which is identical to IEC 61375. It defines the Train Communication Network (TCN) for the transfer of data between electronic equipment on board railway vehicles and across a train. The TCN is the shared “nervous system” for train control, diagnostics, passenger information and multimedia, and its standardisation is central to interoperability between different manufacturers’ equipment and to safe train operation.
The BS EN 61375 series is organised into a general architecture part (Part 1), train-level bus parts (Part 2-x) and consist/multimedia network parts (Part 3-x). Part 1 defines the overall TCN architecture and terminology; Part 2-1 defines the Wire Train Bus (WTB) and Part 2-2 gives its conformance testing; Parts 3-x address the consist network and multimedia systems. The UK committee is GEL/9 (Railway Electrotechnical Applications) through panel GEL/9/-/4.
The series contains 9 standard documents, as shown below.
| Standard No. | Edition | Subject (English title) |
|---|---|---|
| BS EN 61375-1 | 2012 | Part 1: General architecture |
| BS EN 61375-2-1 | 2012 | Part 2-1: Wire Train Bus (WTB) |
| BS EN 61375-2-2 | 2012 | Part 2-2: Wire Train Bus conformance testing |
| BS EN 61375-2-3 | 2015 | Part 2-3: Communication protocol related parts (scanned) |
| BS EN 61375-2-5 | 2015 | Part 2-5: Communication protocol related parts (scanned) |
| BS EN 61375-3-1 | 2012 | Part 3-1: Consist / multimedia network (scanned) |
| BS EN 61375-3-2 | 2012 | Part 3-2: Consist / multimedia network (scanned) |
| BS EN 61375-3-3 | 2012 | Part 3-3: Consist / multimedia network (scanned) |
| BS EN 61375-3-4 | 2014 | Part 3-4: Consist / multimedia network (scanned) |
BS EN 61375-1:2012 is identical to IEC 61375-1:2012 (3rd edition), prepared by IEC/TC 9 “Electrical equipment and systems for railways”, with ICS 45.060 (railway rolling stock).
Part 1 establishes the layered and topological concepts of the TCN: at train level the WTB connects the vehicles, while within a consist the consist network (MVB / Ethernet consist network and so on) connects the devices, forming a train–consist–device hierarchy, and it defines addressing, real-time behaviour, redundancy and fault detection requirements.
Part 2-1 defines the physical, data-link and application layers of the WTB, including the bus medium (screened twisted pair), transmission rate, frame format, node addressing, master–slave polling and token mechanisms. The WTB supports automatic reconfiguration when trains are coupled, making it the backbone of train-level information exchange.
Part 2-2 specifies the test items, methods and acceptance criteria for WTB conformance, covering physical-layer parameters, protocol behaviour, timing, fault injection and boundary conditions, to verify that a device genuinely complies with the WTB specification.