BS EN 55016 — Radio Disturbance and Immunity Measuring Apparatus and Methods Standard Series

Specification for Radio Disturbance and Immunity Measuring Apparatus and Methods (CISPR 16 series)

📡 BS EN 55016 is the British adoption of the CENELEC series EN 55016, which is identical to the CISPR 16-1 series of international standards. The series specifies the measuring instruments, coupling devices, antennas and test sites used to measure radio disturbance (emission) and immunity (susceptibility), together with the measurement procedures and the evaluation of measurement uncertainty. It is one of the most frequently applied basic EMC standards for type testing, product certification, and laboratory accreditation.

💡 The BS EN 55016 series is developed by CISPR (Comité International Spécial des Perturbations Radioélectriques) and published by the IEC under the CISPR 16 designation. BSI, as a member of CENELEC, implements it as a British Standard with identical technical content.

1. Series Structure and Scope 📌

The BS EN 55016 series is organised into three functional blocks: Part 1 (measuring apparatus, corresponding to CISPR 16-1), Part 2 (measurement methods, corresponding to CISPR 16-2) and Part 4 (measurement uncertainty, corresponding to CISPR 16-4). The sub-parts in this batch cover:

StandardMain ContentCISPR Equivalent
BS EN 55016-1-1:2010+A2:2014Measuring apparatus — requirements for disturbance and immunity measurement equipmentCISPR 16-1-1
BS EN 55016-1-2:2014Measuring apparatus — coupling devices for conducted disturbance measurementsCISPR 16-1-2
BS EN 55016-1-4:2010+A1:2012Measuring apparatus — antennas and test sites for radiated disturbance measurementsCISPR 16-1-4
BS EN 55016-1-5:2015Antenna calibration and test sites for 30 MHz to 1000 MHzCISPR 16-1-5
BS EN 55016-1-6:2015Validation of anechoic chambersCISPR 16-1-6
BS EN 55016-2-1:2014Conducted disturbance measurement methods (AMN)CISPR 16-2-1
BS EN 55016-2-2:2011Measurement of disturbance power (CDNE/ISN)CISPR 16-2-2
BS EN 55016-2-3:2010+A2:2014Radiated disturbance measurement methods (antennas and sites)CISPR 16-2-3
BS EN 55016-2-4:2004Immunity measurement methods (conducted and radiated)CISPR 16-2-4
BS EN 55016-4-2:2011+A1:2014Uncertainty in EMC measurements (statistical treatment)CISPR 16-4-2
⚠️ Part 1 defines “what you measure with”, Part 2 defines “how you measure”, and Part 4 defines “how trustworthy the result is”. The three blocks work together: without compliant apparatus, however good the method, the results cannot be relied upon.

2. Measuring Apparatus: Part 1 Requirements 🔧

Part 1-1 specifies the technical requirements for disturbance measuring receivers (quasi-peak, average and RMS detectors), artificial mains networks (AMNs), voltage probes, current probes and absorbing clamps, covering frequency range, input impedance, detector characteristics, bandwidth, and overload capability, together with calibration and periodic check requirements. Measured results are only comparable when the apparatus meets these specifications.

Part 1-2 deals specifically with coupling devices for conducted disturbance measurements, including artificial mains networks, impedance stabilisation networks (ISNs) and common-mode termination networks. It is worth noting that, at the 2014 revision, the UK voted against approval, expressing concern that clause 9 (CDNE-M) does not provide a representative simulation of mains cabling — an illustration that the standard continues to evolve in engineering practice.

Part 1-4 specifies the antennas and test sites used for radiated disturbance measurements, covering antenna factors, site attenuation, open-area test sites (OATS) and anechoic chamber requirements, and adds provisions for the evaluation of a set-up table above 1 GHz. Parts 1-5 and 1-6 provide antenna calibration methods and chamber validation procedures respectively.

💡 Calibration is the lifeblood of EMC measurement. Antenna factors, network insertion loss and receiver indication error all propagate directly into the final value; test equipment must be used within its calibration validity period.

3. Measurement Methods: Part 2 Essentials 📏

Part 2 provides uniform test set-ups, procedures and reporting rules according to the type of disturbance and the object under test:

  • Conducted disturbance (2-1/2-2): in the 9 kHz to 30 MHz range, measured at mains and signal ports through artificial mains networks or impedance stabilisation networks; specifies EUT placement, earthing, cable routing and measurement time.
  • Radiated disturbance (2-3): in the 30 MHz to 1 GHz range (and above), using an antenna at a test site (OATS or semi-anechoic chamber); specifies antenna height scanning, horizontal/vertical polarisation, EUT rotation and measurement distance.
  • Immunity (2-4): defines the generic set-up and criteria for conducted and radiated immunity tests, used to evaluate the robustness of equipment in an electromagnetic environment.
🚨 Results depend strongly on the geometrical consistency of the test set-up. Differences between laboratories in measured values are often caused by differences in EUT placement, cable length and earthing rather than by inherent device differences — always follow the prescribed set-up and record it.

4. Measurement Uncertainty: Part 4-2 📊

Part 4-2 gives the method for evaluating EMC measurement uncertainty, expressing results as “measured value ± expanded uncertainty”. It systematically analyses uncertainty contributions such as receiver error, antenna factor, cable loss, site factors and set-up repeatability, and provides the statistical procedures for combination and expansion. For conformity assessment, uncertainty must be taken into account so that the inherent error of the measurement system does not cause erroneous pass/fail decisions.

5. Engineering Practice 🛠️

  • 🔍 Laboratory construction: build and validate an OATS or anechoic chamber per parts 1-4/1-5/1-6, and equip it with calibrated receivers, antennas and AMNs.
  • 🔧 Pre-compliance testing: use the methods of parts 2-x for pre-scanning and formal measurement to identify out-of-limit frequencies early and shorten the certification cycle.
  • 📋 Certification and market access: the series is referenced by product standards such as EN 55011 and EN 55032 and forms the basis of EMC conformity assessment under EU CE directives.
  • 📊 Uncertainty management: establish laboratory uncertainty evaluations and quality documentation per part 4-2 to satisfy the traceability requirements of ISO/IEC 17025.

6. Frequently Asked Questions ❓

❓ Q: What is the relationship between BS EN 55016 and CISPR 16-1?
A: BS EN 55016 is the British/European adoption of the CISPR 16 series, technically identical to CISPR 16. The British designation is BS EN 55016 while the international designation is CISPR 16-1.
❓ Q: Why must measuring apparatus be calibrated periodically?
A: Receiver indication, antenna factors and network insertion losses drift over time and directly affect measured values. The standard requires apparatus to be used within its calibration validity, otherwise results lack traceability and comparability.
❓ Q: What is the difference between conducted and radiated disturbance measurements?
A: Conducted disturbance propagates along mains or signal cables at lower frequencies (9 kHz to 30 MHz) and is measured with AMNs/current probes; radiated disturbance propagates through space at higher frequencies (above 30 MHz) and is measured with antennas at a test site. The two measurements address different coupling paths.
🔍 Q: Why does measurement uncertainty matter?
A: Every measurement has error. Uncertainty gives the credible range of the measured value; a laboratory issuing a pass decision must consider uncertainty to avoid misclassifying an out-of-limit product as compliant, or vice versa.
🔒
正在加载下载地址,请稍候 10 秒

Leave a Reply

Your email address will not be published. Required fields are marked *