🔥 BS EN 15698 is the European standard series for preinsulated bonded twin pipe systems used in directly buried district heating (hot water) networks. It comprises two parts: BS EN 15698-1:2009 “Twin pipe assembly of steel service pipe, polyurethane thermal insulation and outer casing of polyethylene” and BS EN 15698-2:2015 “Fitting and valve assembly of steel service pipes, polyurethane thermal insulation and outer casing of polyethylene”. UK participation was entrusted to Technical Committee RHE/9 (Insulated underground pipelines), and both parts were published as the UK implementation of EN 15698-1:2009 and EN 15698-2:2015, classified under ICS 23.040.10. Together with BS EN 253 (single-pipe preinsulated directly buried pipes), the series forms the European product-standard framework for district heating networks, defining the requirements for “twin-pipe” preinsulated assemblies in which the supply and return pipes share one insulation and casing.
💡 Unlike BS EN 253, where each pipe is insulated separately, BS EN 15698 covers “twin-pipe” systems: the supply and return steel pipes share one insulation layer and outer casing, reducing footprint and heat loss — typically used for small-diameter district heating branches and local networks. The twin structure imposes higher demands on the integrity of the insulation and casing.
1. Series Overview and Scope 📌
The series applies to preinsulated bonded twin pipe systems for directly buried district heating hot water networks. Part 1 specifies the straight pipe sections (twin pipe assembly); Part 2 specifies fittings (elbows, tees, etc.) and preinsulated valve assemblies. Both product groups share the structure of “steel service pipe + rigid polyurethane foam insulation + polyethylene outer casing”, emphasising layer bonding and overall watertightness.
| Standard | Subject | Published | Core Content |
| BS EN 15698-1:2009 | Twin pipe systems — Part 1: Twin pipe assembly | January 2009 | Straight-section structure, layer bonding, insulation performance, casing and watertightness |
| BS EN 15698-2:2015 | Twin pipe systems — Part 2: Fitting and valve assembly | August 2015 | Elbows/tees, preinsulated valves, joints and test requirements |
⚠️ Once buried, directly insulated pipes are difficult to repair. Long-term durability of the insulation, casing and layer bonding, and above all watertightness, are critical; strictly follow the standard’s factory tests and site joint procedures.
2. Part 1: Twin Pipe Assembly (Straight Pipe) 🔧
BS EN 15698-1:2009 specifies technical requirements for the straight sections of directly buried twin pipes:
- Structure: two steel service pipes, rigid polyurethane foam insulation, polyethylene outer casing, and necessary supports/spacers;
- Layer bonding: bond between steel and insulation and between insulation and casing, ensuring integral load transfer and watertightness;
- Insulation performance: density, thermal conductivity and cell-structure requirements of the polyurethane foam;
- Casing performance: wall thickness, density, anti-ageing and mechanical properties of the polyethylene casing;
- Watertightness and signal wires: end sealing, watertightness and optional leak-detection signal-wire requirements;
- Tests and inspection: factory inspection items (appearance, dimensions, bonding, insulation) and test methods.
🚨 Layer bonding is the key difference between “bonded” and “sliding” systems. Poor bonding causes insulation slippage, casing instability and water ingress, leading to steel corrosion; factory tests must check bond and shear performance.
3. Part 2: Fitting and Valve Assembly 📋
BS EN 15698-2:2015 specifies requirements for fittings (elbows, tees, reducers) and preinsulated valve assemblies of twin-pipe systems:
- Fitting types: steel fittings such as elbows, tees and reducers together with their insulation structure;
- Preinsulated valves: valve (e.g., gate/ball) integrated and insulated as one assembly;
- Joints and connections: site joint treatment between fittings/valves and straight pipes (insulation, sealing, watertightness);
- Performance requirements: insulation performance, casing watertightness, and valve operation and sealing requirements;
- Tests and inspection: pressure tests, insulation checks and factory inspection of fittings/valves.
💡 Network leaks most often occur at fittings, valves and joints. Part 2 specifically governs these locations, requiring reliable field-joint sealing (heat-shrink/electrofusion or similar), plus watertightness and signal-wire connections.
4. Technical Comparison of the Two Parts 🔍
| Dimension | Part 1: Twin Pipe Assembly | Part 2: Fitting and Valve Assembly |
| Subject | Straight twin-pipe sections | Elbows/tees and preinsulated valves |
| Structure | Steel + polyurethane + casing | Steel/valve + polyurethane + casing |
| Key requirements | Layer bonding, insulation, casing, watertightness | Joint sealing, valve performance, watertightness |
| Application | Main straight runs of the network | Bends, branches and maintenance valve locations |
5. Engineering Practice and Application Guidance 🛠️
- 🔍 Design selection: select twin-pipe system size by medium temperature, pressure and diameter; verify insulation and casing;
- 🔧 Procurement and acceptance: check factory test reports (insulation density, thermal conductivity, bonding, casing performance); sample and re-test;
- 📊 Site joints: perform site joint treatment of fittings/valves with straight pipes per Part 2, ensuring sealing and watertightness;
- 📋 Leak monitoring: use embedded signal wires (where available) for leak detection and timely fault location;
- 🛡️ Operation and maintenance: maintain network records, periodically monitor insulation and corrosion, and focus on valve and joint locations.
When specifying a preinsulated bonded twin pipe system, the procurement specification should reference both parts of the series together, because the straight pipes of Part 1 and the fittings and valves of Part 2 are installed as one continuous network. The steel service pipes are typically butt-welded on site, and the weld quality must be controlled in accordance with the applicable welding codes before the polyurethane foam is injected into the joint cavity. Factory production control should verify the foam density, the bond between the steel and the insulation, and the casing wall thickness, while the site jointing process should demonstrate that the heat-shrink or electrofusion closure provides a watertight seal around the pipe. Where leak-detection signal wires are fitted, their continuity and connection to the monitoring system should be checked before backfilling. Finally, the network operator should record installation details, joint locations and test results so that any future excavation or repair can be planned efficiently.
6. Frequently Asked Questions ❓
❓ Q: What is the difference between twin-pipe and single-pipe systems (BS EN 253)?
A: In single-pipe systems each pipe is insulated independently, suited to larger main lines; twin-pipe systems place supply and return pipes in one insulation and casing, with smaller footprint and lower heat loss — typical for branches and local networks.
❓ Q: Why emphasise “bonded” insulation?
A: The bonded system makes steel, insulation and casing act as one assembly, sharing loads and preventing water from penetrating along the interfaces; poor bonding leads to slippage, instability and water-ingress corrosion.
❓ Q: How is site-joint watertightness assured?
A: Field joints use heat-shrink sleeves, electrofusion or dedicated sealing methods, plus insulation make-up and signal-wire connection; joint quality determines long-term network reliability.
❓ Q: How is leakage monitored in buried pipes?
A: Some systems embed leak-detection signal wires, locating water ingress/leaks by resistance change; combined with insulation moisture detection and temperature-drop monitoring.