📐 ANSI N45.2.10-1973 is the “common language” standard of the N45 series of nuclear quality assurance standards. Prepared by the N45-2.10 ad hoc committee under ANSI Committee N45 (Reactor Plants and Their Maintenance) and approved by ANSI on May 31, 1973, it compiles terms and their definitions that are important to the uniform understanding of the intent of required quality assurance practices for the construction of nuclear power plants. It is an indispensable reference for drafting QA documents, contracts, and audit review activities across the nuclear industry.
Section 1 (Scope) states that the Standard contains certain terms and their definitions important to the uniform understanding of the intent of required quality assurance practices for the construction of nuclear power plants. Its Applicability clause notes that the definitions apply to terms generally used in the N45.2 standards published or under preparation; in certain instances a term may also appear in another standard with a unique or more specific definition peculiar to that application.
The Responsibility clause emphasizes that it is the user’s responsibility to ascertain that the definitions are appropriate for the intended application; where a term is used with a different intent than contained herein, clarification must be provided at the point of application. This arrangement preserves flexibility while preventing ambiguity from spreading.
Section 2 lists terms alphabetically with their definitions. Representative terms grouped by category include:
| Category | Term | Definition Essence |
|---|---|---|
| Authorization | Approval | An act of endorsing or adding positive authorization, or both |
| Data & documents | As-Built Data | Documented data that describes the condition actually achieved in a product |
| Verification | Audit | An activity to determine through investigation the adequacy of, and adherence to, established procedures, instructions, specifications, codes, and standards, and the effectiveness of implementation |
| Evidence documents | Certificate of Conformance | A written statement signed by a qualified party certifying that items or services comply with specific requirements |
| Evidence documents | Certificate of Compliance | A written statement signed by a qualified party attesting that items or services are in accordance with specified requirements, accompanied by substantiating information |
| Test evidence | Certified Test Report | A written and signed document, approved by a qualified party, containing sufficient data to verify specified requirements |
The terminology of N45.2.10 is coordinated with the other N45.2 series standards (e.g., N45.2 QA program requirements, N45.2.6 qualification of inspection personnel, N45.2.9 QA records, N45.2.12 auditing, N45.2.13 procurement control), so that terms such as approval, audit, surveillance, acceptance, nonconformance, and quality records are used with consistent meaning across the industry. This alignment directly affects:
Beyond the terms tabulated above, the Standard also defines Inspection, Examination, Surveillance, Nonconformance, Quality Record, and Hold Point. Together these terms delimit the boundaries of nuclear quality activities: inspection verifies the condition of an item, examination observes and measures a process or characteristic, surveillance provides continuing observation and confirmation of performance, nonconformance identifies an item or activity that does not meet requirements, and quality records provide evidence that quality activities were performed as specified. The completeness of this vocabulary directly affects the quality of procedures, checklists, and audit reports — an ambiguously worded procedure is certain to generate differing interpretations during execution, and differing interpretations are the classic breeding ground for quality disputes between owner, contractor, and supplier.