🔍 ASME EA-1G-2010 (ANSI designation ASME TR EA-1G-2010, reaffirmed 2015) is the companion technical report / application guide to ASME EA-1, Energy Assessment for Process Heating Systems. It provides technical background and application details in support of understanding and applying EA-1: the rationale for the technical requirements of the assessment standard, technical guidance, application notes, alternative approaches, tips, techniques, and rules-of-thumb, as well as example results from fulfilling the standard’s requirements. A process heating system is defined as a group (set or combination) of heating equipment used for heating materials used in the production of goods in an industrial plant. Such systems typically account for the largest share of industrial energy consumption, so their assessment and optimization carry major savings potential.
The EA-1G body contains seven sections: 1 Scope and Introduction, 2 Definitions, 3 Overview of the Standard — How to Use ASME EA-1, 4 Guide to Organizing the Assessment, 5 Guide to Conducting the Assessment, 6 Guide to Analysis of Data From the Assessment, and 7 Guide to Reporting and Documentation. It is supported by figures (selection guides for temperature- and pressure-measuring instruments, flow measurement methods, important data-collection areas, the sequence of assessment activities, a heating-cycle representation for a continuous furnace, and pie-chart/Sankey presentations of results) and by numerous tables and data-collection forms. Nonmandatory Appendix A lists key references, Appendix B illustrates sampling-instrumentation locations for certain measurements, and Appendix C provides an example work plan for a process heating assessment.
Section 4 guides organizing the assessment: first form the assessment team (typically an energy engineer, operations personnel, and maintenance personnel, with external experts when needed), define the goals and boundaries (which heating equipment, which energy carriers), and prepare a work plan. EA-1G recommends completing data-collection planning before field work begins: list the information to be gathered for each class of heating equipment (nameplate data, fuel type, production rate, operating cycle, etc.) and predefine instruments and sampling locations. Appendix C provides a work-plan template, and Fig. 6 lists the assessment activities and their sequence required by EA-1.
| Assessment Phase | Main Activities | Key Outputs |
|---|---|---|
| Organize and plan | Form team, define scope, prepare work plan and data-collection plan | Work plan, equipment list, instrument list |
| Collect data | Record design and operating data; measure temperature, pressure, flow, flue gas composition | Data-collection forms, operating logs |
| Analyze data | Build the heat balance, draw Sankey diagrams, identify losses and saving opportunities | Heat-balance sheet, Sankey diagram, opportunity list |
| Report and document | Summarize results, make recommendations, issue the formal assessment report | Assessment report, implementation plan |
Section 5 provides instrument-selection guides for conducting the assessment. Fig. 1 and Table 1 give a general guide for temperature-measuring instruments — thermocouples, RTDs, infrared (radiation) pyrometers — across temperature ranges and accuracy needs; Fig. 2 covers pressure instruments; Fig. 3 covers flow measurement methods (vortex, orifice, pitot, ultrasonic, etc.). Figs. 4 and 5 show important areas and example data to collect during equipment assessments, and Tables 2–6 give suggested formats for installed-meter information, control-system information, maintenance practices, required data lists, and sampling procedures.
| Measured Parameter | Common Instruments | Typical Range/Features | Assessment Use |
|---|---|---|---|
| Flue gas temperature | Thermocouples (K/S), infrared | 300–1600°C | Stack-loss calculation |
| Furnace wall/surface temperature | IR thermometer, surface thermocouple | Ambient–400°C | Shell-loss estimation |
| Flue gas composition | Gas analyzer (O₂/CO) | O₂ 0–21% | Excess-air coefficient |
| Fuel flow | Vortex, orifice, mass flow | Per line size and fuel | Input-energy metering |
| Product/workpiece temperature | Thermocouples, tracking thermometry | Per process | Useful (product) heat estimation |
Section 6 guides data analysis. The core is building a heat balance: input energy (fuel lower heating value + sensible heat of combustion air + sensible heat of materials) equals useful heat (heat carried away by product, steam/water generated, etc.) plus the losses (stack/flue-gas losses, wall losses, opening radiation and infiltration, cooling-water losses, unburned losses, etc.). Fig. 7 shows an example heating-cycle representation for a continuous furnace; Figs. 8 and 9 demonstrate presenting results as pie charts and Sankey diagrams — the Sankey diagram, whose band widths show where energy goes at a glance, is the most powerful communication tool for reporting to management. Table 7 gives a cooling-water-loss calculation example and Table 8 a tabular presentation of results.
Section 7 guides reporting and documentation: the report should state the assessment objectives, scope, methods, data summary, heat-balance results, the identified energy-saving opportunities (Table 9 lists possible areas of energy savings or heat-loss reduction in process heating equipment), and a recommended implementation sequence. Common opportunities include: