BS EN 60974 — Arc Welding Equipment Standard Series

Arc Welding Equipment — BSI National Standard (identical adoption of the IEC 60974 series)

🔥 BS EN 60974 is the UK national standard implementing the European standard series EN 60974, identical to IEC 60974 of the International Electrotechnical Commission, prepared by IEC/TC 26 (Electric welding equipment) with UK participation through Technical Committee WEE/6 (Electric arc welding equipment). The series specifies the safety, performance, electromagnetic compatibility (EMC), and test requirements for arc welding equipment (welding power sources, torches, wire feeders, cooling systems, etc.), and is an important technical basis for the design, manufacture, certification, and safe on-site use of arc welding equipment.

💡 Arc welding equipment combines high-power electrical and high-temperature operations and requires very high safety levels. The EN 60974 series follows a “whole-machine safety (Part 1) + subsystem/specialised requirements (Part 2 onwards)” structure, unifying the specifications for welding power sources, plasma cutting, torches, wire feeding, cooling, and EMC, and is referenced by relevant EU directives.

1. Overview of the Series 📌

Arc welding equipment forms a complete system from power source to torch, wire feeder, and cooler, each subsystem having specific electrical, mechanical, and thermal safety requirements. The EN 60974 series is organised by “whole machine + subsystems”: Part 1 states the general safety requirements (electric shock, heat, mechanical, EMC) and ratings for welding power sources; Parts 2–13 specify, respectively, plasma cutting systems, torches and guns, wire feeders, cooling systems, safety, EMC requirements, ratings and test methods, arc striking and stabilising devices, and test plates. Each part gives the corresponding performance and test criteria.

PartTechnical SubjectEdition
Part 1Welding power sources — safety requirements and ratings2012
Part 2Liquid cooling systems2013
Part 3Power sources for arc welding and plasma cutting2014
Part 4Current-limiting devices / intershield2016
Part 5Wire feeders2013
Part 6Limited-input manual arc welding systems2016
Part 7Torches and guns2013
Part 8Gas-shielded metal arc welding equipment (GMAW/MIG-MAG, etc.)2009
Part 9Installation and EMC guidelines2014 (A1:2015)
Part 10EMC requirements2014 (A1:2015)
Part 11Electrode holders and earth clamps2004
Part 12Plasma cutting systems2011
Part 13Welding test plates / trials2011
⚠️ Most parts of this series are scanned files with limited readable content; the technical points below are summarised from the readable text of Parts 1, 10, and 11, the forewords, and public domain knowledge. Detailed clauses follow the current official BSI edition.

2. Key Technical Requirements 🔧

1. Safety requirements and ratings of welding power sources (Part 1 / EN 60974-1:2012)

This standard is identical to IEC 60974-1:2012 and specifies the general safety requirements for arc welding power sources: protection against electric shock (open-circuit voltage limits, insulation, earthing), protection against heat (overload, temperature rise), mechanical safety, clearances and creepage distances, marking, and instructions, together with ratings (rated welding current, duty cycle, maximum welding current, etc.). It supersedes BS EN 60974-1:2005 and is the core safety specification for the whole machine.

2. Electromagnetic compatibility (Parts 9 and 10)

Arc welding equipment is a potential source of electromagnetic disturbance and may also be affected by radio-frequency interference. Part 10 specifies the EMC requirements (emission and immunity limits) for arc welding equipment; Part 9 gives installation and EMC guidance (correct wiring, earthing, distance from sensitive equipment) to help users meet the electromagnetic environment requirements in actual conditions.

3. Torches, wire feeding, and cooling (Parts 5, 7, 2)

Part 5 specifies the electrical and mechanical safety, wire-feeding accuracy, and tests of wire feeders; Part 7 specifies temperature rise, insulation, mechanical strength, and safe use of torches and guns; Part 2 specifies the flow, temperature rise, pressure, and earth-leakage protection of liquid cooling systems. These subsystems together ensure stable and safe welding.

4. Plasma cutting systems (Part 12) and electrodes/clamps (Part 11)

Part 12 specifies the safety and performance of plasma cutting systems (high-voltage arc striking, cutting current, gas paths); Part 11 specifies the current capacity, temperature rise, insulation, and mechanical-strength requirements of electrode holders and earth clamps for manual metal-arc welding.

3. Engineering Practice Essentials 🛠️

  • 🔍 Equipment selection: select equipment compliant with the relevant EN 60974 part according to the welding process (manual metal-arc, MIG/MAG, TIG, plasma cutting), and pay attention to whether the rated welding current and duty cycle meet continuous-operation requirements.
  • 🔧 Installation and EMC: follow the Part 9 guidance to standardise wiring, earthing, and shielding of the power source and torch cables, control the distance from sensitive electronic equipment, and add filtering/shielding where necessary to meet the Part 10 EMC requirements.
  • 📊 Safe use: strictly follow the Part 1 electric-shock and heat-protection requirements (open-circuit voltage, cooling, insulation checks) and wear personal protective equipment (eye protection, gloves, fume protection).
  • 📋 Certification and acceptance: manufacturers should carry out type tests and EMC tests per the series and issue CE/UKCA declarations; users should verify ratings and EMC marking on delivery.
🚨 Arc welding involves risks of electric shock, arc flash, fume, high temperature, and fire. Never operate in wet, un-earthed, or insulation-damaged conditions; welding power sources must be reliably earthed, and Class E products (enhanced electric-shock protection) must observe open-circuit voltage and circuit-limitation requirements.

4. Frequently Asked Questions ❓

❓ Q: Are EN 60974 and IEC 60974 the same set of standards?
A: Yes. BS EN 60974 is identical to IEC 60974 (“identical to IEC 60974-x”), so equipment built to this series is mutually recognised across IEC member states, the EU, and the UK, facilitating international trade and certification.
❓ Q: Why specify EMC separately for arc welding equipment?
A: Welding power sources use high-frequency striking and high-current inverters, which create electromagnetic disturbance affecting radio and instruments and may themselves malfunction under interference; separate EMC limits (Part 10) and installation guidance (Part 9) ensure electromagnetic-environment compatibility.
❓ Q: What does “duty cycle” mean?
A: The duty cycle is the relative time a power source can operate continuously at rated welding current (e.g. 60% means 6 minutes of full load per 10-minute period). Exceeding the rated duty cycle triggers overheat protection and may damage the equipment.
🔍 Q: How can scanned parts be used for equipment certification?
A: Scanned parts offer limited readability. Equipment design, certification, and acceptance should follow the current official BSI printed/electronic edition (or the corresponding IEC text), strictly applying the limits, tests, and criteria in the original text.
🔒
正在加载下载地址,请稍候 10 秒

Leave a Reply

Your email address will not be published. Required fields are marked *