BS EN 60700 — Thyristor Valves for High Voltage Direct Current (HVDC) Power Transmission Standard Series

Electrical Testing (Part 1) and Terminology (Part 2) (IEC 60700 Series)

🔌 BS EN 60700 is the British Standards Institution series adopting European Standard EN 60700, identical to IEC 60700, which covers thyristor valves for high voltage direct current (HVDC) power transmission. HVDC transmission is key to long-distance, large-capacity, low-loss power transfer in cross-regional grid interconnection and offshore wind delivery, and the thyristor converter valve is the core equipment of a converter station. Part 1 specifies the electrical testing of thyristor valves; Part 2 specifies the terminology for thyristor valves. The series was prepared by Technical Committee PEL/22, Power electronics, and is an important basis for converter valve design, type testing, routine testing and acceptance.

💡 The converter valve is the core of a.c./d.c. conversion in HVDC systems, subject long-term to high voltage, large current and severe transient stresses. Systematic electrical testing and unified terminology in accordance with BS EN 60700 are fundamental to valve reliability and international engineering collaboration.

1. Scope and General Framework 📌

The BS EN 60700 series is identical to IEC 60700, prepared by SC 22F “Power electronics for electrical transmission and distribution systems” of IEC/TC 22 “Power electronic systems and equipment”, and was adopted in the UK by Technical Committee PEL/22. Part 1 (2015 edition) supersedes the 1998+A2:2008 edition; Part 2 (2016 edition) is a first issue. The series applies to thyristor valves in HVDC systems, covering the electrical performance, test conditions and acceptance criteria of rectifier/inverter valves, together with a unified terminology system.

⚠️ Converter valve testing is a special high-voltage, high-power activity requiring dedicated test circuits and safety precautions. Electrical tests must be performed in laboratories with appropriate qualifications and conditions; test voltage, current and duration shall strictly follow the standard to avoid damage to the valve and test equipment.

2. Structure of the Series 📋

Standard NumberTitleIEC ReferenceMain Content
BS EN 60700-1:2015Thyristor valves for HVDC power transmission — Part 1: Electrical testingIEC 60700-1:2015Types of electrical tests, test circuits, test conditions, test procedures and acceptance criteria
BS EN 60700-2:2016Thyristor valves for HVDC power transmission — Part 2: TerminologyIEC 60700-2:2016Unified definitions of valve and components, operating modes, tests and parameters

3. Key Technical Requirements 🔧

3.1 Types of Electrical Tests

Part 1 specifies the electrical tests to be performed on thyristor valves, mainly including type tests (e.g. insulation tests, operating tests, non-recovery/recovery overvoltage tests, transient current tests, fault current tests) and routine tests (e.g. auxiliary supply tests, control and protection function tests, fibre-optic and firing-system checks). The tests cover valve electrical performance under normal operation, transient overvoltage and short-circuit fault conditions.

3.2 Insulation Tests

Insulation tests verify the valve’s insulation withstand capability, including power-frequency, lightning impulse and switching impulse tests for earth insulation, phase-to-phase insulation and valve-terminal insulation. Test voltage levels are determined from system voltage and insulation coordination; during the test, the voltage distribution across thyristor levels and grading conditions should be monitored to confirm adequate insulation margin.

Test CategoryProperty AssessedKey ParametersTypical Criterion
Insulation testsValve insulation withstand capabilityPower-frequency, lightning/switching impulse voltageNo breakdown, no flashover, voltage distribution satisfactory
Operating testsValve performance at rated operating conditionsRated voltage, current, firing angleCorrect conduction and extinction, losses within limits
Transient overvoltage testsValve withstand of switching overvoltagesRecovery/non-recovery overvoltageThyristor-level grading and protection act correctly
Fault current testsValve withstand of short-circuit fault currentFault current magnitude and durationNo damage, protection functions act correctly
Auxiliary and control testsFiring and protection system functionsFiring signal, protection settingsFiring sequence and protection logic correct

3.3 Test Circuits and Conditions

Part 1 details the test circuit configurations (such as synthetic test circuits and back-to-back test circuits), test conditions (voltage, current, frequency, temperature, cooling conditions) and test procedures, with requirements for test records and judgement. Synthetic test circuits can simulate the high-voltage, large-current operating conditions of converter valves in the laboratory, and are a common means for type testing.

3.4 Terminology System

Part 2 establishes a unified terminology system for the converter valve field, covering key terms such as valve, valve arm, thyristor level, firing system, cooling system, operating modes (rectifier/inverter), switching angle and overvoltage protection. Unified terminology eliminates ambiguity in engineering collaboration and provides the basis for standard drafting of contracts, design documents and test reports.

4. Engineering Practice and Application 🛠️

  • 🔍 Type-test management: after design of the converter valve prototype, organise type tests per BS EN 60700-1 to verify performance under insulation, operating and fault conditions, producing a type-test report as the basis for product qualification.
  • 🔧 Factory quality control: perform routine tests and checks on production valve components to verify firing, protection, auxiliary supply and cooling system functions, ensuring consistency and reliability of delivered products.
  • 📊 Station testing and commissioning: use the standard terminology and test methods in station (subsystem and system) tests to verify the interface and overall performance of valves with the station control system.
  • 📋 Operation and maintenance: prepare operation manuals and maintenance procedures based on the standard terminology, standardising thyristor-level replacement, grading and firing-system checks to extend valve-group life.
✅ Applying the BS EN 60700 series throughout valve design, type testing, factory and site commissioning, together with unified terminology, significantly improves the quality and collaboration efficiency of HVDC projects, providing an important guarantee for reliable converter-valve operation.

5. Frequently Asked Questions ❓

❓ Q: What roles do BS EN 60700-1 and BS EN 60700-2 play?
A: Part 1 specifies electrical tests — types, circuits, conditions and acceptance criteria; Part 2 specifies unified terminology — definitions of valve, components, operating modes and parameters. The former addresses “how to verify performance”, the latter “how to unify language”.
❓ Q: What is a synthetic test circuit and why is it used for valve testing?
A: A synthetic test circuit applies high voltage and large current to the valve from separate voltage and current sources, simulating the electrical stresses of the valve under real operating and fault conditions in the laboratory. It is more economical and controllable than direct high-power testing and is a common method for valve type testing.
❓ Q: Why is voltage distribution checked in insulation tests?
A: In a stacked thyristor valve, multiple thyristor levels are connected in series to withstand voltage; the grading and voltage distribution across levels directly affect the valve’s insulation withstand capability. Uneven distribution can overstress individual levels, so the test must monitor and confirm satisfactory grading.
🔍 Q: How is this series related to IEC 60700?
A: BS EN 60700 is the British version of EN 60700, and EN 60700 is technically identical to IEC 60700. Test requirements and terminology for converter valves are therefore unified across Britain, Europe and the international community, easing cross-border HVDC collaboration.
🔒